FIT OUT

Ras Gas


Client: RasGas
Category: Fit-out
Consultant: Arab Consulting Engineers
Project Manager: Hill International
Built-up area: 18,000 m2

Domopan’s fit-out division undertook the supply, installation, and painting works of all internal wall partitions for RasGas’s new 50-storey headquarters in West Bay. Using laser technology for exact and accurate measurements, the internal walls had to meet very stringent and close to zero-tolerance requirements of both the supervision consultant and project manager. Accuracy was a must in order to accommodate custom-made glass imported from Italy that would be used for the office facades.

project2
Scroll down for next project

FIT OUT

Souq Waqif Hotel


Client: Souk Waqif Hotel (Private Engineering Office)
Category: Fit-out
Consultant: Decorelle
Built-up area: 4300 m2

The Souq Waqif Hotel, a local landmark with architectural themes inspired by Qatari heritage, had to ensure a high degree of acoustic insulation as is required by most hotel/hospitality projects. As the client was already familiar with the quality and specification of Domopan’s wall partitions from previous projects, Domopan’s product was recommended.. The fit-out division undertook the job, satisfied the acoustic requirements and successfully completed the project under a tight schedule.

project3
Scroll down for next project

FIT OUT

Al Jassimiya Tower


Client: Al Jassimiyah Real Estate
Category: Fit-out
Consultant: EGEC
Built-up area: 25,000 m2

This iconic tower, located on Doha’s corniche and a part of Doha’s glittering skyline, is composed of 44 floors of Grade-A office space. The main contractor needed a quick and high-quality solution for the offices’ internal walls given the project’s tight schedule. Domopan’s fit-out division undertook the supply, installation and painting works of all internal wall partitions.

project4
Scroll down for next project

FIT OUT

MATHAF


Client: Qatar Foundation (Qatar Petroleum)
Category: Fit-out
Consultant / Project Manager:ASTAD
Built-up area: 3000 m2

The Arab Museum of Modern Art, built to celebrate works by Arab artists and offer an Arab perspective on international modern and contemporary art, was designed by renowned French architect JeanFrançois Bodin. Execution of the architect’s concepts called for the use of unconventional construction methods. The fit-out contractor needed a solution for the erection of ten-meter high internal walls. Domopan took on the challenge and adopted a top-down approach with the walls successfully installed and approved as per standards of the museum.

project5
Scroll down for next project

FIT OUT

BARWA CITY SCHOOLS


Client: Barwa City
Category: Fit - Out
Consultant: Aecom, MZ & Partners
Built-up area: 36,250 m2

The Barwa City Project is a development designed to establish a modern community with a contemporary setting.The development comprises around 6,000 apartments in 128 buildings, spread across 1.35 million square meters. The East and West Schools of Barwa City will accommodate the educational needs of this community’s children in a state of the art facility. Domopan was directly nominated by the client, Barwa, to design and build of 36,250 m2 of drywall partitions in the interior of the Schools and Kindergartens in the Amenities Zones. As the only local entity capable of achieving the safety and acoustic specification needed to achieve the educational environment envisioned in this school, Domopan had to coordinate with a consortium of reputable consultants including Aecom, MZ & Partners, Tanween, and Qatar Project Management (QPM).